IEC QUALITY ASSESSMENT SYSTEM (IECQ)
For rules and details of the IECQ visit www.iecq.org |
IECQ Certificate of Conformity
Distributor
|
IECQ Certificate No.: | IECQ-P BSI 11.0003 | Issue No.: | 2 | Status: | Superseded |
|
Supersedes: | IECQ-P BSI 11.0003 Issue 1 | Issue Date: | 2013/11/04 | Org. Issue: | 2012/01/13 |
CB Reference No.: | D2019 IECQ | Expiration: | 2015/01/12 | | |
|
APC Technology Group plc t/a Advanced Power Components
47 Riverside
Medway City Estate
Rochester, ME2 4DP
United Kingdom
|
The organization has developed and implemented procedures and related processes that have been assessed by the IECQ Certification Body in accordance with IECQ 03-1 and IECQ 03-2 for issuance of this certificate and found to be in conformity with the applicable requirements of the IECQ Approved Process Scheme and in respect of standard(s) or specification(s):
|
|
- For a complete list of standards and specifications see the attached schedule of scope.
- ISO 9001:2008 {2008} Quality management systems - Requirements
|
Process Manual Reference: | Issue 18 | |
|
|
|
Scope of Activity: | | | |
. |
Issued by the Certification Body: BSI |
Kitemark Court, Davy Avenue Knowlhill, Milton Keynes MK5 8PP
United Kingdom
Authorised Person: Paul Turner
| | |
|
The validity of this certificate is maintained through on-going surveillance audits by the IECQ CB issuing this certificate. This Certificate of Conformity may be suspended or withdrawn in accordance with the
Rules of Procedure of the IECQ System and its Schemes.
This certificate and any schedule(s) may only be reproduced in full.
This certificate is not transferable and remains the property of the issuing IECQ CB.
The Status and authenticity of this certificate may be verified by visiting www.iecq.org.
| |
|
IECQ-P Rev. 07 EN
- Attached Translation: none [ Add ] |